Case Study “Gas Turbine – Planned Shutdown”

Inside a Gas Turbine: Understanding the Impact of Planned Shutdowns

The increase in metrics during shutdown and startup events enables the evaluation and quantification of the impact of planned and unplanned events on the condition of the generator and hydraulic starter. Signs of wear in the system can be detected using particle counting in the oil, especially during generator shutdown and startup processes and in the hydraulic starter system.

Downloads
DOWNLOAD

[ News ] room

Latest related case studies

[ SEE MORE ]

Case study “Gas turbine – Unplanned shutdown”

Will it Start? Monitoring the Startup System of a GasTurbine

[ SEE MORE ]

Case Study “Gas Turbine – Correlation”

Don’t panic: Avoid catastrophes through the combination of data correlation and the OilWear S120

[ SEE MORE ]

Case study “Hydraulic Systems”

Prevent possible system interruptions, which can generate incidents with an average cost of 1,500 euros per hour, excluding materials.

[ SEE MORE ]

Case study “Mining shovels”

A mine reduces bearing and gear failure by 60%, increasing the life of gearboxes with Atten2 technology